Description:
‘ENERGETIKA’ Kragujevac, a state-owned company specialising in steam generation and air conditioning, has taken an important step towards environmental protection. In 2021, the old coal-fired boilers were replaced by modern gas-fired boilers, which have been in operation since the 2022/2023 heating season. This conversion has significantly reduced the plant's environmental impact.
In a further project for the next three years, it is now planned to use the waste heat from a data centre located near the ‘Aerodrom’ boiler house heating plant and feed it into the district heating network using a heat pump. The data centre is planned for two expansion stages and the first has been in operation for less than two years. The currently installed cooling capacity of the 2 modules is 4.4 MW. The expansion of the data centre to 4 modules is expected to double the cooling capacity, which is planned for the coming years. The cooling system is designed for redundant operation.
By using the waste heat from the data centre in Kragujevac and other measures to increase energy efficiency in the hot water system, a significant reduction in greenhouse gas emissions will be achieved.
The initiative highlights the importance of continuous improvement through the exchange of expertise and experiences, ensuring medium to long-term success.
Categories:
Language:
English
Page count:
5
Copyright:
Connective Cities